Decommission Design

Topside Removal with Two Barges Floatover Study

The two barge floatover is an efficient method to decommission and re-use the topside, with the weight ranges from 1500MT to more than 6000MT. The two barge floatover decommission can be divided into six major phases, including standby, mating of transfer, exit, hold-on, entry and mating of float-over.

PTTEP Removal & Resue Jacket Desigen

PTTEP plans to study the possibility of reusing/relocating a conventional jacket in order to utilize the existing conventional jackets from previous phases after the 1st installed locations to other prospective locations on the Gulf of Thailand Field, which is expected to be a major contributor to the cost reduction. The topside, boat-landing Jacket and Pile up to (-) 5m below seabed to be remove from JKWK and wet tow to TRP-19, The distance between two platform location is approximate 18 nm.

The wet tow analysis is to assess the vessel rotation, Jacket CoG motion & Acceleration, Jacket Bottom Clearance, Boom, Sling & Crossing Line Tension, and the clearance between Jacket and Vessel to check operational environmental condition.

Design and Engineering for WZ10-3 SPM Removal Operation
COOEC North Sea TAKA Decks Decommission Pre-Bid Support